New House Construction (Germantown) (New House Index)

Electrical, Insulation, and Drywall (March 2016)

To enlarge a photo, click on it. Each photo is named in the following format: YMD-HMS. Hover over a photo to view this information.





  View on YouTube (New Window)



  View on YouTube (New Window)









  February = Warm, March = Snow (Go figure...)





























































































































  We should have kept the tub in the hallway...



























  Ephraim Running and Falling through Vent...

  Watch Here: On YouTube











































































  Kitchen Island Anchor...















  Looking East from Appleton Ave. (near Holy Hill Rd.)



  Our house is at the center of the circle...



  Distance: 1.75 miles, Elevation: 150 feet, Focal Length: 250mm







  Elliot helping build the house...

  Watch Here: On YouTube





























































































































































  View from the vacant lot across the street (see the panoramic photo at the bottom of this page)...



















































  ...but what about Roll??



























  Blowing the Insulation from the Truck...

  Watch Here: On YouTube





































































































  Natural Gas installation...















Panoramic (Middle House):




  Panoramic View...

  Watch Here: On YouTube
Top of Page